Step 7 Assemble Front Wall - Single Door1. Cut (2) two 58-1/2" long 2x4s to a length of 54-1/4"to be used for top and bottom wall plates.2.
This material is packed in door carton.Step 8 Set Walls Panels2. Secure wall panels together at the corners. Use (4) four 10d coated nails per corner.
flush1. Install a gable on the rear wall. The gablesiding will extend over the 1x4 trim on thelower wall. NOT behind the trim!Secure gable to wall by
1. Install (2) two 2x4-6' boards as tie plates across the sidewall with the double doors.Use 10d sinkers.2. Now that the front gable is installed
Inside of Building2x4 Tie Plate1. Layout the truss spacing from the rear of the building. Measure from the backside of the2x4 gable frame when marking
3. Install soffit panels on theopposite side. Start with a24" long panel that has a'LAP' edge.Step 13 Set Roof TrussesRear GableSet roo
Optional ridge vent providesideal ventilation.AirSpaceTrussShinglesStep 15 Install Roof Sheathing1. Starting at the rear of the building, install 4&ap
1x6 FasciaFeltPaper1x6 Gable Trim48" x 83-1/2"1. Install roof sheathing at the front of the building. The roof sheathing will extend pastthe
5. Locate (2) two 1x3-72" long trim boards. Tack these boards, with a couplenails, to each side of the door opening. You may want to move the tri
Step 18 Install Doors & Hardware4. Before you fasten the hinges to the doortrim, temporarily prop the doors in theopening. Leave a space at the to
When measurements are given for a boardlength or width, it is from the longest side.measure from hereThank you for purchasing our Fairview kit. These
Material Packaged In Component Kit3 1 lb. box 10d Sinkers3 1 lb. box 8d Galv.2 1 lb. box 7d Sinkers1 1 lb. box 6d Galv.3 1 lb. box 6d Common1 1 l
12' - 0" Building WidthTo keep 2x4 frame frommoving, toe nail to 4x4.DOUBLE DOOR WALLXXXXXX16"15-1/4"2x4 Joist HeaderXX16"Typ
Step 1 Assemble TrussesBuilding Tip: To aid in the assembly of the trusses, temporarily screw 2x4 blocks tothe floor. There are short 2x4s, that may h
Screw gable plate to trussleg with 2-1/2" screw.Step 2 Assemble Roof Gables1. Butt (2) two 72" long 2x4s together and secure by nailing a 3-
2. Install gable siding using 6d galv. nails acrossthe top of the gable frame. Use 8d galv. nailsalong the bottom edge. See Note Below. *Tongue EdgeLA
AABBXXXXXX2. Install 72" wall studs between the top and bottom plates. Assemble wall frames with10d sinkers, two (2) nails at each stud end. Nail
XXXXXXXX72" Wall PlateXXXXXXXXSiding 1/2" BelowTop PlateSiding Extends 3/4" Below PlateLAP Edge1. Position 2x4-72" boards together
3. Cut (2) two more 34-3/4" plates from a 2x4-6' boardand assemble another wall frame.1. Assemble a wall frame using (3) three 72" wall